RWE Power: Simulator for Virtual DCS Commissioning
The retrofit of an existing power plant unit challenges the operator and the contractor with high complexity and a serious amount of unpredictability. Reducing
project risk is key to ensuring that the downtime of the unit is minimized and ultimately the retrofitted unit goes into operation on time and performs in the way it should.